Here at Sheridan Lifts it’s been a terrific start to 2019 – we are refurbishing and maintaining more lifts than ever before, and we are growing rapidly as a business. If you want to put faces to names, why not visit our new about us page where you can see how handsome we all are!
Added to this, we are covering all types of lift installations across many different sectors from food and catering to housing, industrial, residential and a growing number of projects working in the healthcare sector to add to some of our work last year at locations including Queen Elizabeth Hospital, the Doctors Laboratory and Wakefield Intermediary Care Unit.
Upcoming projects include….
Northampton General Hospital where we are installing two large goods lifts to serve a brand-new ward in the hospital. The hospital is managed by Northampton HNS Trust and the lifts in question will be 33-person Electric Traction VVVF Drive bed lifts of 2500kg.
Another project is set to get underway around March 2019 following Sheridan Lifts appointment by our client Wildgoose Construction and that will see us installing an eight-person electro traction lift at Saffron Medical Centre in Leicestershire.
Medical centre and hospital projects are no strangers to Sheridan Lifts. In addition to the projects listed above we have also carried out three separate lift modernisation jobs at North Manchester General Hospital to bring their lifts up to requirements.
Further projects include…
We’ll also be on site at Briardene Care Home in Scarborough where we are installing two 8-person Kleemann electro traction lift to assist the residents and staff at this residential facility in Yorkshire. And we’re installing a screw and nut platform lift with built in intercom system at St Stephen’s Children Centre in London.
There is literally no let-up in our projects, and as we look forward to 2019, we hope you will utilise our services should you be in search of a lift company with a great reputation paired with 40 years of invaluable industry experience.